The first thing we did in the project (not this lesson) was organise everything into bins (folders). This helped a lot and saved us a lot of time because we actually knew every clip and where to find it.



The clips that needed lipsyncing are all done and in layers, and now we're taking chunks out of those ones which fit into the point of the timeline best. We have saved 506 versions of the project so far. This is because if anything goes wrong we can go back to a previous version. We did do this once because Steve told us to put a midshot in as a bassline type thing but the clip we chose and the clips we took out made the video worse than it was before.


We took this screengrab whilst the clip was rendering. We figured out a way so that we don't have to render everything the moment we move a clip, so we can work freely.